Fuel Terminal
-
Client: Astiku Sakti / Shell Indonesia, Location Pendingin, Year 2009
- Total Capacity 12.000.000 Ltrs
- Support Facility Truck Loading
- Jetty Distribution Points
- Fire Hydrant System
- Pump and Distribution Lines
- Power Generation and Electric Control system
- Control Room
-
Client: Astiku Sakti / Shell Indonesia, Location Pendingin, Year 2009
- Total Capacity 12.000.000 Ltrs
- Support Facility Truck Loading
- Jetty Distribution Points
- Fire Hydrant System
- Pump and Distribution Lines
- Power Generation and Electric Control system
- Control Room
-
Client: Astiku Sakti / Shell Indonesia, Location Pendingin, Year 2009
- Total Capacity 12.000.000 Ltrs
- Support Facility Truck Loading
- Jetty Distribution Points
- Fire Hydrant System
- Pump and Distribution Lines
- Power Generation and Electric Control system
- Control Room
Various Tank
-
Client: iso tank
-
Client: Mud Tank (Half Round Bottom)
-
Client: Water Tank (V Bottom)
Construction
-
Client: Kariangau Power - Power Plant 30MW
- Supply Steel Construction
- Silo Hopper Tanks
- Fuel Tanks
- Piping Steam and Non Steam
- Isolation Works
-
Client: Kariangau Power - Power Plant 30MW
- Supply Steel Construction
- Silo Hopper Tanks
- Fuel Tanks
- Piping Steam and Non Steam
- Isolation Works
-
Client: Petrosea - POSB (Balikpapan)
- Thermal Plant Building Construction
- Supply and Install OH Clamp Sell
- Water Treatment Tanks
- Fuel Tank
- Piping System
-
Client: Petrosea - POSB (Balikpapan)
- Thermal Plant Building Construction
- Supply and Install OH Clamp Sell
- Water Treatment Tanks
- Fuel Tank
- Piping System
Oil Rig Repair
-
Client: Parameswara Jack Up Rig Repair
- Hull Repair
- Mud Pit Repair
- Low Pressure & High Pressure Piping Renewal
-
Client: Parameswara Jack Up Rig Repair
- Hull Repair
- Mud Pit Repair
- Low Pressure & High Pressure Piping Renewal
-
Client: Raniworo Jack Up Rig Repair
- Hull Repair
- Mud Pit Repair
- Low Pressure & High Pressure Piping Renewal
- New BOP Deck Structure
- New Shaker House and Piping System
-
Client: Raniworo Jack Up Rig Repair
- Hull Repair
- Mud Pit Repair
- Low Pressure & High Pressure Piping Renewal
- New BOP Deck Structure
- New Shaker House and Piping System
Liquid Mud Plant
-
Client: MI Swaco
-
Client: Halliburton
-
Client: Scomi
Offshore Basket & Container
-
Client: OFF SHORE DESIGN TO EN12079 Std. & DNV 2.7-1 (2013)
- Cutting Skips
- Open Top Cargo Basket
- Mini Containers
- Half Container
- 20 Ft & 40 Ft Containers
- ISO Tank
-
Client: OFF SHORE DESIGN TO EN12079 Std. & DNV 2.7-1 (2013)
- Cutting Skips
- Open Top Cargo Basket
- Mini Containers
- Half Container
- 20 Ft & 40 Ft Containers
- ISO Tank
-
Client: OFF SHORE DESIGN TO EN12079 Std. & DNV 2.7-1 (2013)
- Cutting Skips
- Open Top Cargo Basket
- Mini Containers
- Half Container
- 20 Ft & 40 Ft Containers
- ISO Tank
Ship Building
-
Client: Steel Boat / Catamaran
- Collaborating with Malaysian Company
- Technical backing from Australian Firm boat manufacturer
-
Client: Aluminum "Sea Bus" / Crew Boat
- Collaborating with Malaysian Company
- Technical backing from Australian Firm boat manufacturer